Bridge work will begin Monday (8/6) on Illinois 133, two-and-a-half miles east of Lovington. The existing bridge carrying 133 over Jonathon Branch is being removed, and it will be replaced with a box culvert. To complete the work, the highway will be closed during the project. A marked detour will be in place to guide traffic around the road closure. The road will be closed from August 13th to October 12th, weather permitting.
Bridge Work Begins Today
Aug 6, 2018 | 4:30 AM